
Lee County Private Provider vs. County Inspections: Costs, Timelines, and What to Expect
In Lee County, the choice between county inspections and a private provider is mainly a choice about scheduling, coordination, and cost. The county route uses the building department’s review and inspection process. A private provider performs eligible building-code reviews and inspections under Florida Statute 553.791, while Lee County remains the permitting authority. For a project where a delayed review or inspection holds up the next trade, that distinction can matter as much as the service fee.
Apex Private Provider offers Lee County private-party plan reviews and inspections, with a stated 48-hour plan-review turnaround, same-day live video inspections with a licensed Professional Engineer, and results at the end of the video call. Photo and video submissions can receive results within 1 to 2 hours. Its published private-provider prices range from $425 for a qualifying roofing repair or re-roof package to $5,000 for a commercial property up to 5,000 square feet. Lee County plan reviews average 3 to 4 weeks according to Apex’s price and service information, but neither timeline should be mistaken for a guaranteed permit issuance date.
Private-provider fees are paid separately from county charges. Lee County discounts applicable permit fees by 25% to 50% when a private provider is used, depending on the qualifying scope. The practical comparison is therefore not just the county fee versus the private-provider quote. It is the remaining county charges plus the private-provider fee, weighed against the scheduling value of keeping the project moving.
What a private provider does in Lee County
A private provider is an alternative for eligible building-code plan review and construction inspections. Instead of relying solely on the county to perform those services, the property owner elects to use a qualified private professional for the assigned scope. The county still receives the required permit materials and retains its role in permitting and matters outside that scope.
Our plan-review service uses licensed Professional Engineers to review applicable trades under Florida Statute 553.791. Reviews address code compliance, structural integrity, and life safety for residential and commercial new construction, additions, remodels, and accessory structures. We work with designers to resolve review issues and reduce resubmittals, and clients have direct access to the reviewing engineer. Those details matter when a plan comment requires more than a generic status update: the designer needs to understand what must change before submitting again.
Inspections serve a different purpose. A plan review evaluates proposed work before construction proceeds. An inspection evaluates work at a particular construction stage, when the relevant components can still be seen. An engineering letter is different again: it is a signed and sealed professional document addressing a structural condition or repair. These services may interact on the same project, but one should not be assumed to replace another.
Private provider versus county inspections at a glance
Question | County process | Apex private-provider process |
Who handles the assigned building-code review or inspection? | County building personnel. | Licensed professionals performing the agreed private-provider scope. |
How is an inspection coordinated? | Through the county’s scheduling process and availability. | Directly with the private provider for the assigned inspection. |
What plan-review timing should I consider? | Lee County plan reviews average 3 to 4 weeks in Apex’s service information; the actual review depends on the submission and county workload. | Apex states a 48-hour plan-review turnaround. Corrections and work outside the private review remain separate scheduling considerations. |
When do inspection results arrive? | Through the county inspection process. | At the end of a same-day live video inspection, or within 1 to 2 hours for submitted photos and videos. |
Who issues the permit? | Lee County. | Lee County still issues the permit. |
How are costs structured? | Applicable county charges. | A separate private-provider fee, with applicable county permit-fee discounts based on qualifying services. |
The comparison has an important boundary: faster building-code review does not mean every other approval is complete. A project may still need county or other agency decisions on matters outside the private-provider assignment. Likewise, an inspection result is not a substitute for permit issuance or final project closeout.
What does a Lee County private provider cost?
The most useful starting point is a quote matched to the permit type and the inspections the project will actually need. A single roof package, a new house, and a commercial buildout are not interchangeable purchases. Apex’s published price guide lists the following private-provider packages:
Project or service | Published price | Included scope |
Roofing repair or re-roof | $425 | Notice of commencement review, product-approval verification, in-progress sheathing and fastening inspections, and final roof inspection. |
Residential in-ground swimming pool or spa | $1,100 | Plan-review affidavit plus steel and placement, rough electrical, main drain, and final inspections. |
Single-family home up to 2,500 square feet | $2,650 | Architectural, structural, and trade plan-review affidavit plus up to 12 milestone inspections through certificate of occupancy. |
Single-family home from 2,501 to 3,500 square feet, or duplex | $3,250 | Plan review plus up to 14 total milestone inspections across both duplex units, where applicable. |
Commercial property up to 5,000 square feet | $5,000 | Compliance review and trade inspections for retail, offices, and small warehouses. |
Custom structural project | Quoted individually | Structural reviews, calculations, and documentation matched to the project. |
Read the included scope as carefully as the price. For a new house, the listed milestone count matters: compare it with the project’s expected inspection schedule and ask how any inspections beyond the package would be handled. For a roof, confirm that the proposed work fits the roofing package rather than assuming every roof-related permit has the same review needs. For a commercial project, identify the trade inspections and any reviews outside the assigned private-provider scope before treating the published price as the entire permitting budget.
Engineering letters have their own pricing because they answer a different question. Apex lists a $675 signed and sealed Tier 1 letter without calculations, an $850 Tier 2 letter with limited basic calculations, and a $1,025 Tier 3 letter with detailed calculations for more complex conditions. A Tier 1 same-day rush request may be accepted for an additional $150, subject to availability and receipt of the required information. A letter is not automatically part of a plan-review or inspection package, so budget for it separately if a structural issue calls for one.
How to compare total cost without overlooking the county fee
Build the comparison in three parts:
Identify the private-provider scope and fee. Determine whether the quote covers plan review, inspections, or both, and which milestones are included.
Ask how the applicable county permit-fee discount will be calculated. Apex’s Lee County service information identifies discounts of 25% to 50% when using a private provider. The discount depends on the qualifying services and does not mean every county charge vanishes.
Account for schedule exposure. Consider what it costs your project if a crew cannot cover work, a subcontractor must return, or the next construction stage cannot start. This is a project-specific decision, not a universal savings claim.
For a homeowner with a flexible schedule, the additional private fee may be harder to justify. For a contractor coordinating multiple trades, being able to request a timely inspection and receive a prompt result may be valuable even after adding the private-provider fee. Compare the actual permit and construction plan rather than choosing on one headline price.
How do the timelines really differ?
Plan review: separate the review result from the permit date
Apex states a 48-hour turnaround for its plan reviews. Lee County plan reviews average 3 to 4 weeks in our Lee County service information. Those figures describe review timing, not the time from a first conversation to an issued permit. A complete plan set, usable structural information, and prompt responses to review comments are essential whichever route is used.
Consider a remodel that changes a bearing wall. The design team needs to show the proposed structural work clearly enough for a reviewer to assess the load path and code requirements. If a key detail is missing, a fast initial review still leads to a correction cycle. The advantage of direct access to the reviewing engineer is that the designer can address the actual concern instead of guessing what a comment means. The owner or contractor must still complete the permit submission and respond to any remaining jurisdictional requirements.
Inspections: timing matters only if the work is ready
Apex offers same-day live video inspections with a licensed Professional Engineer, with results at the end of the call. Another option is to submit photos and videos by text, email, or Google Drive for results within 1 to 2 hours. The appropriate inspection approach depends on the work being evaluated and whether the evidence clearly shows the required condition.
For a framing or connection inspection, the professional needs to see the installed condition, not just a close-up that omits its location in the structure. For any inspection, coordinate the request before the work is concealed. A quick appointment does not help if drywall is already installed over the connection or the relevant detail cannot be seen on video.
County inspection timing is tied to county scheduling and availability. Rather than assume a particular county wait time for every inspection, look at the critical stages in your own schedule. A foundation, roof, or rough-trade inspection can determine when the next crew may proceed. That is where the scheduling difference becomes most consequential.
What to expect when using a private provider
We recommend treating private-provider work as a defined part of the permit workflow, not as a way around it. Florida Statute 553.791 establishes the private-provider route for eligible services. Lee County’s private-provider process sets out local steps for election, registration, inspection reporting, and closeout. Its process states that a project using private-provider plan review also requires private-provider inspections.
Define the project and permit scope. Identify whether the work is new construction, an addition, a remodel, a pool, a roof, or another project. Note the address, permit status, and proposed trades.
Choose the assigned review and inspection services. Establish what the private provider will handle and what remains with Lee County or another authority. Confirm the inspection milestones before comparing quotes.
Arrange the required owner election and documents. The property owner’s election is central to the private-provider process. A contractor coordinating the service should have the owner’s required written authorization.
Send a complete plan package. Include the drawings and relevant structural and trade information. Missing details can create a correction cycle regardless of reviewer speed.
Address review comments with the designer. Resolve each issue in the drawings or supporting documentation. Do not assume that a verbal explanation alone changes an unclear plan detail.
Submit the permit materials to Lee County. Private review does not issue the permit. Keep the review documentation aligned with the version of the plans being submitted.
Coordinate inspections before covering work. Provide the permit number, address, inspection stage, and access to the work. Keep approved plans available for reference.
Track results and finish closeout. Maintain inspection records and respond to any corrections. The project still needs the required final documentation and county process before it is complete.
One practical lesson runs through every step: use the same current plan set, project address, and permit details across the designer, contractor, private provider, and county submission. When those records diverge, a fast review can be undermined by avoidable follow-up.
When a failed inspection needs an engineering letter
A failed inspection does not always mean the entire permit must start over. First identify exactly what failed and why. Some conditions can be corrected to match the approved plans and then reinspected. Others involve a structural condition that needs a Professional Engineer’s assessment and a signed and sealed repair letter.
We prepare engineering repair letters for issues such as missing truss straps, cuts into bearing walls, and other structural fixes. To start that review, send the failed inspection report showing the county or city code comments, a wide photo of the affected wall or connection, close-up photos of the problem, and the approved plans and truss package if available. The wide photo gives context; the close-ups show the detail. Both are useful when the engineer evaluates what is actually installed.
The scope determines the letter tier. A straightforward observation may call for a letter without calculations, while a modified beam, header, post, connection, or load path may require calculation work. Unpermitted work can require additional review and documentation and is typically priced under the more detailed Tier 3 scope. If a truss connection is the issue, our guide to when a failed Florida truss inspection needs an engineer’s repair letter explains what to gather before requesting one.
A repair letter addresses the engineering question. The corrected work and any required inspection still have to be completed through the applicable permit process.
Best practices for homeowners, contractors, and realtors
For homeowners: get clear on what the price includes
Ask whether the private-provider proposal covers the plan review, the inspections your permit will require, and final documentation. Then compare the separate provider fee with the remaining county charges. If you are renovating while living in the home, consider whether an inspection delay would leave a room, roof, or utility work unusable longer than planned. The cheapest review route on paper is not always the least disruptive route for the household.
For contractors: schedule around exposed work
Make inspection readiness part of the subcontractor handoff. Check that the work matches the approved plans, that the area is accessible, and that a person on site can show the inspector the relevant details. For a video or photo review, capture an overall view before the close-up so the connection, fastening, or installation can be located. Do not rely on a fast result to rescue an inspection requested after the work has been covered.
For realtors: establish permit status before discussing a deadline
If a sale involves an addition, roof replacement, or work that has attracted an inspection correction, ask for the permit record and the exact outstanding item. An inspection request, an engineering letter, and an issued permit are different things. Knowing which one is needed helps you set a realistic path for the owner and buyer without treating a private-provider appointment as a promise of immediate closeout.
For everyone: identify the bottleneck before paying to solve it
Our approach is to separate a project delay into three questions: Is the hold-up a building-code plan review, an inspection of installed work, or an approval or correction outside those services? Private-provider plan review addresses the first, private-provider inspections address the second, and a structural engineering letter may help resolve a specific technical correction. Buying the wrong service will not shorten the step that is actually blocking the project.
Frequently asked questions
Does using a private provider mean Lee County is no longer involved?
No. Lee County remains the permitting authority. The private provider performs the elected, eligible review and inspection services, while the permit application and matters outside that assignment remain in the applicable jurisdictional process.
Can I use a private provider only for plan review?
Lee County’s published private-provider process states that private-provider plan review requires private-provider inspections for the project. Decide on the full review and inspection scope before electing that route.
Is the 48-hour plan review a 48-hour building permit?
No. The 48-hour figure refers to Apex’s plan-review turnaround. Permit issuance also depends on a complete application, resolution of comments, and the county’s remaining requirements.
Are private-provider inspections always virtual?
No. Apex offers live video inspections and photo or video submissions. The work must be suitable for evaluation through the chosen method, with the relevant conditions visible. Discuss the inspection stage and what must be shown before work is covered.
Will the county permit-fee discount pay for the private provider?
Not necessarily. Lee County discounts applicable permit fees by 25% to 50% for qualifying private-provider work, but the private-provider charge is separate and other county charges may remain. Compare both invoices and the value of the schedule difference.
What if a private-provider inspection finds a problem?
The deficient condition must be addressed before the work can pass that stage. Depending on the issue, the contractor may correct the installation and arrange another inspection, or the project may need revised documentation or a signed and sealed engineering repair letter.
Can an engineering letter replace a required inspection?
Do not assume so. A letter documents a Professional Engineer’s assessment of a particular condition or repair. The permit’s required inspections and closeout steps still need to be satisfied.
What should I send when requesting a quote?
Start with the project address, project type, square footage if relevant, permit status, plans, and the inspections you expect to need. For a failed inspection, include the report and code comments, overall and close-up photos, and any approved plans or truss documents. That information helps identify the appropriate service and price.
Making the right choice for your project
County inspections can be a sensible fit when the schedule is flexible and a separate private-provider fee offers little benefit. A private provider is worth serious consideration when review timing, inspection access, or direct communication with the reviewing engineer affects the next stage of work. In either case, keep permit issuance, other jurisdictional approvals, and construction readiness in the plan.
For Lee County projects that need coordinated plan review, inspections, or a structural repair letter, Apex Private Provider can help you define the scope before work stalls. Call (305) 496-2738 or email Apexprivateprovider@gmail.com with your plans, permit status, and inspection needs.

Comments